- Best quality
- Quick assembly
- Longevity
Solex|SolarBloC®
Solar
thermal
systems
SolarBloC® maxi Premium
Low-Flow (= 0.25 l/minute per m² collector surface), up to 125 m² collector surface
High-Flow (= 0.5 l/minute per m² collector surface), up to 80 m² collector surface
Please note:
In order to guarantee a trouble-free function it is essential to carry out a hydraulic dimensioning/check.
All fluid-carrying parts are made of brass, fully assembled - self-sealing or flat gaskets
All connections 1" internal thread,
flow and return to the collector at equal height - for simple assembly with double pipe
Premounted on steel wall bracket,
can be easily mounted to the wall or - with PAW mounting equipment - directly to the storage tank
Full port ball valves
Check valve in the flow and return ball valve, can be opened by turning the handle to a 45 °C position, 200 mm wc each circuit, especially for solar systems, prevents unwanted circulation
Ball valves key-actuated,
easy handling, no risk of scalding
Airstop in the flow
for permanent deaeration of the heat transfer medium
Compact design insulation with optimised function made of durable elastic EPP;
100 % insulated valves and fittings - excellent ventilation and cooling of the pump, minimal heat losses
Solar safety group
Solar pressure relief valve 6 bars, pressure gauge resistant to high temperature 0-6 bars with valve, fill and drain valve for flushing and filling, flat sealing connection for an expansion tank
With solar high-efficiency pump by Grundfos or Wilo
corresponds to energy efficiency grade A, already installed and prewired
Pump can be isolated, so that it can be replaced without draining
System monitoring
Fulfills the criteria for national promotion of large systems
Safety instructions The installation and commissioning as well as the connection of electrical components require technical knowledge commensurate with a recognised vocational qualification as a fitter for plumbing, heating and air conditioning technology, or a profession requiring a comparable level of knowledge [specialist]. The following must be observed during installation and commissioning: - relevant local and national regulations - accident prevention regulations of the professional association - instructions and safety instructions mentioned in these instructions.
WARNING Danger of scalding due to the escape of hot fluids! With pressure relief valves, there is a risk of scalding due to the escape of vapour or hot fluid. Please ensure for each pressure relief valve that no personal injury or material damage may occur due to possibly escaping medium. - Install a discharge line. - Observe the instructions regarding the pressure relief valve. - The pressures for the expansion tank calculated by the plant designer and the operating pressure of the installation must be set.
CAUTION Personal injury and material damage due to overpressure! Closing both ball valves in the primary circuit will separate the safety group from the heat exchanger. A rise in temperature in the storage tank may result in high pressures, which may lead to personal injury and material damage! - Only close the ball valves for service and maintenance. CAUTION Risk of burns! Valves, fittings and pump may heat up to more than 100 °C during operation. The insulating shell must remain closed during operation.
NOTICE Material damage due to mineral oils! Mineral oil products cause lasting damage to seals made of EPDM, whereby the sealant properties get lost. We do not assume liability nor provide warranty for damage to property resulting from sealants damaged in this way. - It is imperative to avoid that the EPDM sealing elements of the unit get in contact with substances containing mineral oils. - Use a lubricant based on silicone or polyalkylene and free from mineral oils, such as Unisilikon L250L and Syntheso Glep 1 of the Klüber company or a silicone spray.